Consult the drawing for approximate dimensions. For a factory bend not shown, please call for a custom quotation.
| 700MOBHSC60 | Shape or Size | Length (A) | Color | Finish | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
|
|
|
| Primary Material | |
| Shade Material | |
| Net Weight | 1.1 lbs |
| Height | 0.6in |
| Width | 0.3in |
| Length | 0in |
| Wet Listed | |
| Damp Listed | |
| Dry Listed | |
| General Listing | ETL Listed |
| Includes |
| Led Lamp | Integrated LED | Non Led | No Lamp | |
|---|---|---|---|---|
| Delivered Lumens | ||||
| Watts | ||||
| Max Wattage Per Bulb | ||||
| Input Voltage/ Dimming Type | ||||
| CCT | ||||
| CRI | ||||
| LED Lifetime | ||||
| L70 | ||||
| Average Bulb Hours | ||||
| Field Serviceable LED | ||||
| Lamp Base | ||||
| Lamp Shape | ||||
| Lamp Included? | ||||
| Warranty** | 1 Year |
* Dimming information available at www.techlighting.com/Downloads#dimming
** Visit techlighting.com for specific warranty limitations and details.
| Integrated LED | Replacement LED Lamp | No Lamp * | |
| This product can be used to comply with California Building Energy Efficiency Standards 2016 Title 24 Part 6 / JA8. | N/A | ||
| This product can be used to comply with California Appliance Efficiency Standards 2016 Title 20 and may be shipped to and sold in California. | N/A |
* If a light fixture or component does not include a lamp or light source, it is the responsibility of the customer to select a lamp that meets the T24 and T20 requirements.